# of Weeks from Sign-Off

Steel – No Options # of Weeks
6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th
Aluminum – No Options # of Weeks
5W 6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th

CAD Print Lead Time:

Steel – w/ Options # of Weeks
5W 6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th
Basic Stacker
High Option Units
Aluminum – w/ Options # of Weeks
5W 6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th
Basic Stacker
High Option Units

CAD Print Lead Time:

Steel – w/ Light Options # of Weeks
5W 6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th
Aluminum – w/ Light Options # of Weeks
5W 6W Cargo/Tag
7W Cargo/Tag
8.5W Cargo/Tag
8.5W GN/5th

CAD Print Lead Time:

Light Option Example

A light option unit has up to (2) of the following options:

  • Light cabinets – base / overhead
  • Electrical (no generator)
  • Generator prep
  • Interior – ceiling, walls, floor
  • Contractor package
  • Winch
  • Awning
  • Vendor door

(Please call if you think something might fall into this category)

SSA Cargo Lead Times # of Weeks
5W & 6W
7W
8.5W
SSA Auto Lead Times # of Weeks
8.5W Auto
w/ Exit Door
w/ Package C